Energy Demand Forecasting
Load forecasts you can balance a portfolio on - hourly P10/P50/P90, calibration you can check, EU transparency reporting baked in.
LOAD FORECAST - PORTFOLIO LT-B2 · DAY-AHEAD
LOAD, MWP10-P90 fan · P50 dashed
Drivers - tonight's run
Day-ahead nomination - 24 hourly values
MAPE last 30 d ······ 2.8% ✓
interval calibration · P90 covers 91% ✓
⚠ evening peak - interval widened, priced
transparency report ·· auto-prepared ✓
How it works
Learn your load shape
Two years of your metering data: the daily double peak, weekday vs weekend, Lithuanian holidays, degree-days - your portfolio, not a textbook curve.
Feed it real weather
Multiple numerical weather runs, not yesterday's temperature. When the runs disagree, the fan widens - honestly.
Forecast with intervals
Hourly P10/P50/P90 for day-ahead and intraday; peaks flagged. Calibration is tracked so that P90 actually means 90%.
File and learn
Nominations to your trader, ENTSO-E transparency reporting auto-prepared, every forecast archived with its inputs. Monthly imbalance-cost report.
The Four Guarantees™ - this build
Measured value
~20% imbalance-cost cut vs your current method - the agreed number (conservative), backtested on two years of your load before go-live.
Defensible
Every forecast archived with its inputs - weather run, calendar, model version. Auditable when the regulator or balancing partner asks. ENTSO-E reporting built in.
Self-correcting
Intraday recalibration as weather runs update; interval calibration tracked monthly; drift alerts on structural change - a new large consumer, solar growth.
Yours & everywhere
Runs in your cloud, full source. MCP endpoint - your trading desk tools and copilots read forecasts directly.
The number, sized honestly
Reference buyer: Lithuanian or Baltic energy supplier, DSO or industrial balancing-group member - a portfolio where imbalance settlement is a visible line on the P&L.
Three ways to own it
| Tier | What you get | Price | |
|---|---|---|---|
| Scaffolding ★ | The full repo - load forecasting pipeline (LT calendar + degree-days), weather ingestion, interval-calibration harness, transparency-report generator, MCP server. Reference run on public ENTSO-E data. | €2,490 | |
| PoC ★★RECOMMENDED | Trained on two years of your metering data - MAPE and interval calibration backtested against your actual load. Code + quality report yours. No guarantee before the backtest speaks. | from €7,500 | |
| Implementation ★★★ | Production: day-ahead + intraday runs, nomination workflow, calibration monitoring, weather-feed maintenance, retraining, monthly imbalance-cost report - the agreed number (conservative) attaches here. | from €22,500 |
★ = engagement depth. PoC is the recommended path: quality proven on your data before production money. The PoC carries no performance guarantee by design; the agreed number (conservative) attaches at Implementation, informed by the PoC report.
What we don't promise
Ready to see your own number?
Request the build: within 48h you get a personal reply with the value sized to your volume.
No commitment · reply within 48h · your data stays in the EU